METHOD HOMES VISIT
The Wet Core is moving ahead at record pace! atelierjones visited the three wetcores under construction at the Method Homes Factory earlier this week, and were excited to see them completely framed and mechanical/electrical/plumbing rough-in starting. The factory build was high quality, and it was exciting to see how much had been accomplished in just two weeks. These prefabricated wetcore modules will be the first of three mass timber modular homes to be built this summer and fall in the Sierra Nevada town of Greenville, CA, which was destroyed in the Dixie Fire in August 2021. atelierjones is leading the design and prefabrication process with Method and DR Johnson, who is supplying the mass timber structure for the homes.